Made in America Manufactured in LeRoy, West Virginia
Call us: 304-344-9875
Home  /  Solutions  /  Forestry Access — Pennsylvania

Timber Bridge Solutions for Forestry Access in Pennsylvania

Pre-engineered crossings rated for skidders, forwarders, and log trucks. Delivered fully assembled and installed in hours on remote haul roads.

If you're running a timber harvest in Pennsylvania, stream crossings are one of the most time-sensitive and regulation-heavy parts of the operation. The state's 2.2 million acres of state forest land, plus millions more acres of private timberland across the Allegheny Plateau and northern tier, are threaded with mountain streams, seasonal drainages, and headwater tributaries that stand between your equipment and the timber. Every crossing you build has to hold up under loaded skidders and log trucks, satisfy PA DEP Chapter 105 requirements, and ideally be reusable when the harvest block moves.

Temporary fords wash out. Culverts clog with debris and trigger sediment violations. Improvised log crossings fail under heavy equipment. And every day your crew spends building or repairing a crossing is a day they're not harvesting. A pre-engineered timber bridge eliminates this bottleneck. It arrives ready to set, handles the loads forestry equipment demands, and can be picked up and moved to your next job when the cut is finished.

Why Timber Bridges for Forestry Access

56,000 lb Load Rating

The SL40-10-28 handles loaded skidders, forwarders, and tandem-axle log trucks without restriction. No weight limits posted, no load calculations needed on site.

Install with Equipment On Site

No crane, no concrete truck, no specialized crew. An excavator or large loader already working the job sets the bridge in hours. Minimal disruption to the harvest schedule.

Relocatable Between Job Sites

No poured footings or permanent substructure. When the harvest is complete, pick up the bridge and move it to the next crossing. One bridge can serve multiple operations over its lifespan.

Open Span, No Clogging

Unlike culverts that trap debris and cause upstream pooling, the open-span design lets the stream flow unobstructed. No maintenance, no cleanout, no sediment violations from backed-up water.

Simplified Permitting

Minimal in-stream disturbance and no fill material means most forestry crossings qualify for PA DEP General Permits (GP-7 or GP-8) rather than a full individual Chapter 105 permit.

PE-Stamped Engineering Included

Every bridge ships with professional engineer certification and plan sheets. Submit them directly with your permit application without hiring your own structural engineer.

Recommended Model for Forestry Operations

Pennsylvania forestry crossings typically involve mountain streams and headwater tributaries in the 15 to 25 foot range, carrying loaded skidders, forwarders, and log trucks. The SL40-10-28 is the right match for most of this work. Its 30-foot max clear span covers the vast majority of forestry stream crossings in the state, and its 56,000 lb load rating handles standard skidders, forwarders, and tandem-axle log trucks without restriction.

If your operation runs tri-axle trucks, heavy feller-bunchers, or any equipment that approaches or exceeds 56,000 lbs gross weight, step up to the SL40-12-40. It carries an 80,000 lb load rating with an AASHTO designation, and the span and width are identical to the SL40-10-28, so the installation footprint doesn't change. The price difference between the two models is modest, and for operations that rotate equipment between job sites or share crossings with other contractors, the extra capacity removes any question about what can safely cross.

RECOMMENDED SL40-10-28

40-foot stress-laminated timber bridge constructed from 2" x 10" CCA-treated southern yellow pine, encased in 10" x 25 lb/ft structural steel channel. Arrives fully assembled with all hardware, curb beams, and shear plates.

Overall Length
40 ft
Max Clear Span
30 ft
Panel Width
6 ft 6 in
Full Width
13 ft
Load Rating
56,000 lb
Bearing Length
5 ft

Full two-panel bridge (13' wide) with 12' drivable surface between curb beams, wide enough for log trucks and skidders side by side. Contact us for current inventory and lead times.

How It Compares

Forestry operations in Pennsylvania commonly rely on temporary fords, pipe culverts, or rented portable panel bridges for stream crossings. Here's how a pre-engineered timber bridge compares for this application.

Factor Timber Bridge Temporary / Portable Bridge Low-Water Ford
Load Capacity 56,000 lb (up to 80,000) Varies (rental specs) Limited by streambed
Install Time Hours (same day) Hours to days (assembly) Hours (grading only)
Equipment Needed Excavator on site Crane often required Grader / dozer
Sediment Risk Minimal (no in-stream work) Low to moderate High (direct stream contact)
Flood / Washout Risk Low (spans above flow) Low (spans above flow) High (impassable in storms)
Relocatable Yes (reuse indefinitely) Yes (but rental cost repeats) No (site-specific)
Permit Path GP-7 or GP-8 eligible GP-8 (temporary) Waiver if ≤100 ac drainage, non-commercial
Long-Term Cost One-time purchase, reusable Recurring rental fees Repeated repair after washouts

Permitting Considerations in Pennsylvania

Stream crossings for forestry operations in Pennsylvania are regulated under PA DEP Chapter 105 (Dam Safety and Waterway Management). The good news for most timber operations is that forestry crossings frequently qualify for one of two general permits rather than a full individual application. GP-7 (Minor Road Crossings) covers permanent crossings where the watershed drainage area is 1.0 square mile or less. GP-8 (Temporary Road Crossings) authorizes crossings that will be in place for one year or less, which fits most harvest-season access needs. Both general permits are processed faster and with less documentation than an individual Chapter 105 permit.

Pre-engineered timber bridges fit cleanly into this framework. The open-span design places no fill in the waterway, avoids the clogging and scour concerns associated with culverts, and requires no in-stream excavation during installation. This minimal-disturbance profile strengthens the case for general permit eligibility and simplifies the required Erosion and Sediment Control (E&S) Plan. PA DEP mandates an E&S Plan for virtually every timber harvesting operation involving 5,000 square feet or more of earth disturbance, and a crossing with no in-stream work reduces the scope of controls you need to document. On the federal side, the Army Corps Section 404 requirement is typically satisfied through the Pennsylvania State Programmatic General Permit (PASPGP), which consolidates the federal and state review into a single process.

For crossings on state forest land managed by PA DCNR, additional coordination with the Bureau of Forestry district office is required. Your county conservation district is another valuable resource. District staff can help determine which permit level applies to your specific crossing and review your E&S plan before submission. If your site includes streams classified as Exceptional Value or High Quality under PA water quality standards, general permits may have additional conditions or restrictions, so early consultation is strongly recommended.

Frequently Asked Questions

Most forestry stream crossings in Pennsylvania require a Chapter 105 authorization from the PA Department of Environmental Protection. If the watershed drainage area at the crossing is 1.0 square mile or less, the project typically qualifies for General Permit 7 (Minor Road Crossings). Temporary crossings for harvest operations lasting one year or less may qualify for GP-8. Both general permits are significantly faster to obtain than an individual Chapter 105 permit. A federal Section 404 permit is usually covered through the PA State Programmatic General Permit (PASPGP) process, which consolidates the federal and state reviews.
Yes. The SL40-10-28 is rated for 56,000 lbs, which handles most forestry equipment including loaded skidders, forwarders, and tandem-axle log trucks. For operations running tri-axle trucks or heavy feller-bunchers, the SL40-12-40 is rated for 80,000 lbs. Both models span up to 30 feet clear and arrive fully assembled.
The standard two-panel bridge is 13 feet wide with a 12-foot drivable surface between the curb beams. This accommodates standard forestry equipment including skidders, forwarders, and loaded log trucks. Each bridge arrives fully assembled and installs in hours with standard excavating equipment already on site.
Most installations are complete within a single day. The bridge arrives fully assembled and ready to set on prepared bearing surfaces using an excavator or loader already on site. There is no on-site fabrication, no concrete curing, and no crane required, so downtime for your harvest operation is minimal.
They can be either. CCA-treated southern yellow pine provides decades of service life for permanent forestry road crossings. But because the bridge is a self-contained unit with no poured footings, it can also be picked up and relocated to another crossing when a harvest block is complete. This makes it a reusable capital asset rather than a one-time expense, which gives it a significant cost advantage over culverts or poured structures.
Pennsylvania requires a written Erosion and Sediment Control (E&S) Plan for earth disturbances of 5,000 square feet or more, which covers nearly every timber harvesting operation. Your E&S plan should include the planned location of all stream crossings. The good news is that pre-engineered timber bridges minimize site disturbance. Installation requires no in-stream excavation, no concrete work, and no extended construction window, which simplifies the E&S plan and reduces the scope of required controls.

Have a Forestry Access Project in Pennsylvania?

Tell us about your crossing requirements and we'll provide a quote with PE-stamped plan sheets, typically within a few days.